Ordered a Master Control Date from Silix after reading a few threads here. Paid by card, QC came back in two days and I asked for one more photo of the water resistance. Approved it and it shipped the same week.
Ordered Master Control Date, timeline inside
- This topic has 1 reply, 1 voice, and was last updated 6 years, 9 months ago by .
Viewing 2 posts - 1 through 2 (of 2 total)
Viewing 2 posts - 1 through 2 (of 2 total)
- You must be logged in to reply to this topic.